SignIn
Kerala Kaumudi Online
Friday, 04 July 2025 5.22 PM IST

Kuthiran tunnel partially opened as Power Grid's trial run commences

Increase Font Size Decrease Font Size Print Page
ku

THRISSUR: The Kuthiran tunnel in Thrissur was opened partially in order to facilitate the traffic as the trial run for laying Power Grid Corporation's underground cables began on Thrissur-Palakkad stretch. The heavy vehicles coming from the Palakkad region were allowed to pass through the tunnel road.

Though a cloud of dust was raised initially due to the passage of heavy vehicles, a fire force team intervened and settled the dust by sprinkling water. Meanwhile, officials said that traffic regulations will be imposed on Wednesday from 5 am to 5 pm in the evening. The trial run will come to an end by Wednesday.

TAGS: KUTHIRAN TUNNEL, POWER GRID
JOIN THE DISCUSSION
KERALA KAUMUDI EPAPER
TRENDING IN KERALA
TRENDING IN KERALA
X
Lorem ipsum dolor sit amet
consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
We respect your privacy. Your information is safe and will never be shared.