SignIn
Kerala Kaumudi Online
Sunday, 23 June 2024 9.15 AM IST

Vizhinjam port is 85 percent complete: Minister Vasavan

vizhinjam-port

THIRUVANANTHAPURAM: Minister VN Vasavan informed the Legislative Assembly that the construction of the Vizhinjam port is 85 per cent complete. Speaking at the Question Hour, the minister said that the trial run can be conducted by the end of June and that it is expected that the commercial operations of the port can be started within December.

The officials of the Ports and Fisheries Department held three rounds of talks with the trade unions. The minister informed this in response to the question of Neyyatinkara MLA A Ansalan. The minister said that 600 people will be directly employed when the first phase of the port becomes operational.

JOIN THE DISCUSSION
TAGS: VIZHINJAM PORT, KERALA
KERALA KAUMUDI EPAPER
TRENDING IN KERALA
TRENDING IN KERALA
X
Lorem ipsum dolor sit amet
consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
We respect your privacy. Your information is safe and will never be shared.