SignIn
Kerala Kaumudi Online
Thursday, 19 September 2024 4.42 AM IST

Chandrayaan-3 ready, launch in June

Increase Font Size Decrease Font Size Print Page
chandrayaan-launch

THIRUVANATHAPURAM: Chandrayaan- 3 has arrived. The rocket along with the satellites is well placed for the ignition button to be pressed. The only thing that lay void is the slot for the launch. The GSLV MARK 3 rocket will be launched in June of this year. If successful, India joins the rank with other aeronautical superpowers including America, Russia, and China to land its vehicle on the moon.

The Chandrayaan-2 is still a pain for many who have witnessed the live tracking of the graph that stopped a movement when it was just 0.5 km from completion. Hearts stopped a beat and more tears trickled down seeing an uncontrollable ISRO chief K Sivan being patted on the back in a parental gesture by Prime minister Modi. The mission is aimed at better understanding the Moon's composition. Isro has laid out three main objectives for the mission, which include demonstrating a safe and soft landing on the lunar surface, demonstrating the rover's roving capabilities on the moon, and performing in-situ scientific observations. the ladder test of the rocket was successfully completed during the time between January 31 to February 2.

Chandrayaan-3 has three modules. The Propeller, Lander, and Rover module. The lander-rover compatibility and establishing radio frequency communication are prime for success. The total cost of the mission is Rs 650 crores.

JOIN THE DISCUSSION
TAGS: CHANDRAYAN, SRIHARIKOTA, ROCKET, MOON, ISRO
KERALA KAUMUDI EPAPER
TRENDING IN INDIA
TRENDING IN INDIA
X
Lorem ipsum dolor sit amet
consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
We respect your privacy. Your information is safe and will never be shared.